The Buttons for Viber component sends the user text and buttons attached to the keyboard.

Buttons appearance

Viber chat with "button text" buttons in full-width and two-column rows

Viber chat with buttons 1 to 6 and "Big Button!" in the keyboard area

Viber chat with buttons 1 to 6 and "Big Button!" inside a message bubble

Functions

1. Transition to screens.

2. Transition to an external URL.

3. Transition to screens in conjunction with Fork component.

Component setup

1. Add component Buttons for Viber to the screen.

2. Fill in the text field — this text will appear above the buttons.

3. Add the required number of buttons that will be one under the other. To do this, click on the Add button.

4. In the field Button title, enter the text of the button. If you mark Hide button text, the button will come to the bot without text, but in any case, the Button title must be filled in.

5. In order to add some buttons to a row, click on Add button to this row.

There can be no more than 6 buttons in a row. In the case of the maximum number of buttons (6 pieces), the width of all buttons should be 1. For 2 buttons in one row, the width should be 3. For 3 buttons in one row, the width should be 2. If there is only one button in a row, the width should be maximum — 6 points. If the width in the button settings is smaller, then the size of the button in the messenger will not match the width of the input line.

Buttons for Viber button "1" with "Button width in columns" set to 1

"One button in a row" with "Button width in columns" set to 6

If the buttons are attached to the keyboard (Buttons with hints mode), the platform supports a maximum of 24 rows of Viber buttons inclusive, 1 button in a row. If the buttons are attached to the message, the platform supports a maximum of 7 rows of Viber buttons inclusive, a maximum of 6 buttons in a row (the size of one button is 1x1).The total is no more than 42 buttons.

6. If you select Enable hint buttons mode in the settings, then you need to use Fork component to switch to other screens.

7. Place Fork component under the Buttons for Viber component. In the Fork settings, enter the button text in Goal value, and in Transition field, select the desired screen from the drop-down list.

"Enable hint buttons mode" checked with Fork goals to "Screen 1" and "Screen 2"

8. If, instead of clicking the button, the user writes something to the bot, you can set up Default goal in Fork component. Then the user will see the same screen with buttons again. To do this, in the settings, write the text that will be sent to the user and specify the same screen (or, if necessary, another one) for the transition.

Fork "Default transition" set to "Buttons for Viber" with extra fields highlighted

Setting up Buttons for Viber as Buttons

The button must forward either to the screen or to an external URL.

1. Disable Enable hint buttons mode with hints function.

2. In the Buttons for Viber component settings, select the desired screen from the drop-down list to transfer through the button.

"Go to screen" dropdown open, listing "Welcome screen" and "New screen 1"

3. To switch to an external service, mark External URL and place the link to go to an external resource in Go to URL field.

Viber button with "External URL" checked and "Go to URL" set to https://docs.botmother.com/

4. You can change the display of buttons in the messenger using Attach buttons to a message function.

"Attach buttons to a message" checked with keyboard width 6 and height 1

This is how buttons that are not attached to a message look like. In the example, the Viber application is open on the computer and the Attach buttons to а message function is disabled.

Viber chat, buttons 1 to 6 and "Big Button!" not attached to the message

This is how the buttons attached to the message look like. In the example, the Viber application is open on the computer and the Attach buttons to a message function is enabled

Viber chat with buttons 1 to 6 and "Big Button!" attached inside the message

In the Viber app on a smartphone, the attached buttons will be displayed above the input line, the non-attached ones will be displayed under the input line.

Buttons not attached:

Viber app on a smartphone with buttons 1 to 6 under the input line

Attached buttons:

Viber app on a smartphone with buttons 1 to 6 attached to the message

With Attach buttons to message feature enabled, you can send buttons to the user without text.

How to change the button background color

The color of the button will change if you add a color code to Background сolor field. This can be done in the component settings.

Color codes can be found in open sources.

Buttons for Viber "Big Button!" with "Background color" set to #FFFB35

How to change the button font color

The font color on the button will change if a color code is added to the Button title according to the sample:

<font color="#9966CC">Purple text on the button</font>

Viber button "Button title" with a font color tag and "Background color" #FADADD

The buttons in the Viber chat will display the specified font color:

Viber button with purple "Colored font!" text on a pink background

How to add an image to the button background

The image is added by Choose file button in the button settings. After clicking on the button, you can open any file saved on the computer.

You can also add an image to the background of the button by link. The link must necessarily end in png, jpg, jpeg.

Image on button settings with "Enter URL" field and "Choose file" button highlighted

In the bot, the button with the image will look like this:

Viber button "Grass Button!" with a grass photo as its background

To the beginning ↑